top of page

Foundations Built for the Arctic

Canadrill drill rig on a pile foundation site at sunset in Nunavut

Since 1979, Canadrill has provided drilling, steel pipe piling and structural steel across Nunavut, the Northwest Territories and Northern Quebec from our base in Iqaluit.

What We Do

From the first test hole to the last weld on the pile cap, with equipment and crews already in Nunavut.

PILE FOUNDATIONS

Rock socket and adfreeze steel pipe piles, extensions and battered piles.

STRUCTURAL STEEL

CWB-certified fabrication of pile caps, bracing, beams and brackets, installed by our crews.

SURVEYING

Pile layout, site datum ties and as-built surveys, so every pile lands where the engineer drew it.

TEST DRILLING

Drilling to support geotechnical site investigations, plus pile installation records and as-builts.

Built Across Nunavut

Crane and steel piles at the Grise Fiord, NU water treatment plant
Pile foundation for the Cambridge Bay, NU power plant
Drill rig installing piles at the Arctic Bay, NU water treatment plant
Braced steel pile foundation for the Grise Fiord, NU multi-use facility

Water Treatment Plant

GRISE FIORD, NU

CAMBRIDGE BAY, NU

Power Plant

ARCTIC BAY, NU

Water Treatment Plant

GRISE FIORD, NU

Multi-Use Facility

bottom of page